Evan and Erin's 2004 kitchen and house remodel
Week #3

Notes:

Week #3


Drywall and insulation installation


The new wall really takes shape


Complete drywall


The new entrance door and frame arrived and prepped

 


Cerebus guards the newly-installed gates


Why we liked this particular design.

 


The end of week #3 left us with an interestingly tented work space
(ie: Meth Lab)


(Evan thinks it's more a Infectious Disease lab look than Meth lab)


Notice the dramatic lighting effects